How to get a cost estimate before anything is generated

Last updated 2026-10-10 · 2 min read

Say what the film is and add "estimate the whole thing before generating anything". Vizard Agent reads the current tool prices, plans the shot count and the grade of generation each shot needs, and reports what the finished film should cost before it spends anything.

What do you type into Vizard Agent?

Put the estimate instruction at the top and the skip list at the bottom. Vizard Agent reads the whole brief before starting, and the skip list is what turns a general request into a costed plan rather than a thorough one.

Prompt

Make a [60–62] second vertical [9:16] film about [subject]. DO NOT GENERATE ANYTHING YET. First calculate and report the total estimated cost for the complete finished film. If it cannot be finished within [my ceiling], stop and tell me before spending anything. Use around [8] connected moving shots. Use image-pinned standard-grade generation for most scenes, and a maximum of ONE premium hero shot, reserved for [the reveal]. Do NOT: audition voices, generate voice tests, create character reference sheets, generate alternative takes, generate multiple versions of scenes, use lip-sync, use enhancement or upscaling, or run unnecessary regeneration passes. Voice: use [name] for all dialogue. Do not search for another.

What does Vizard Agent actually do?

Most of what a generated film costs is not the film. It is the auditioning, the alternate takes, the reference sheets and the review passes. So the first step is reading the current tool prices and their limits, before a single shot is planned. In the session behind this article it:

When does this not work well?

An estimate is an estimate. Vizard Agent prices the plan it has, and what pushes a production past it is usually what nobody planned for: a shot that fails twice, a change of mind, a late fix. Skipping too much can backfire, because some passes exist to save work.

Common questions

Will the estimate be exact? No. Vizard Agent prices the plan, and re-shoots and changes move the total.

What if it cannot be done in budget? It stops and says so. Vizard Agent reports before spending rather than after.

Which steps are safe to skip? Auditions, alternate takes and enhancement passes. Vizard Agent will tell you which ones it thinks you need.