Vizard Agent

How to cut a long ride into a cornering highlight film

Last updated 2026-08-25 · 7 min read

Upload the whole ride and tell Vizard Agent which sections matter. Vizard Agent analyses the entire recording for cornering sequences rather than for isolated moments, inspects the frames on either side of every cut, and will rebuild the ending if the footage offers a better one than the route did.

What is the short version?

A ride recording is one continuous point-of-view take where almost nothing is a moment. There is no crash, no goal, no punchline — just road — so the edit has to search for a type of section rather than for highlights.

  1. Go to Vizard Agent and upload the whole ride.
  2. Say you want the cornering sections, not general highlights.
  3. Say the length and whether you want a cinematic intro.

What do you need before you start?

The recording and the route. Vizard Agent finds the corners itself by analysing the footage, so nothing needs marking. Naming the road is worth doing because it gives the intro titles something real to say, which is most of what makes this format feel like a film rather than an export.

What do you type into Vizard Agent?

Name the type of section rather than asking for highlights. Vizard Agent searches for cornering sequences as a category when you ask that way, which is a different operation from picking the most eventful moments and produces a very different film.

Prompt

Create a high-energy riding video focused on the best cornering sequences from this ride on [the road]. Short cinematic intro, around [4] minutes.

Variants worth knowing:

What does Vizard Agent actually do?

Here is the order Vizard Agent worked in on a real ride film. Two things are worth noticing: the search is for a type of section, and the ending was changed after Vizard Agent went looking at what else the footage contained.

  1. Checks the project history and the recording's technical details.
  2. Analyses the whole ride for cornering sections while the footage downloads.
  3. Reads back the located sequences and extracts sample frames from each candidate.
  4. Reviews the first batch of frames, then samples the mid and closing sequences separately.
  5. Compares possible intro backgrounds and reviews the candidates.
  6. Checks the available display typefaces, locates the font files and builds a test version of the intro titles.
  7. Renders the full cut and inspects the frames on either side of every single cut point.
  8. Has the render watched back for flow, dead time and audio, and measures the original ride audio levels.
  9. Looks at the arrival at the petrol station at the end of the ride, inspects the turn-in and the final parked frames, then rebuilds the film with that as the ending and has the new version watched back.

Step 9 is the judgement worth stealing. The brief was about corners, and the best ending turned out to be the moment the ride stopped — which Vizard Agent only found because it went and looked at what else was in the recording after the corners were cut.

What does the result look like?

From the run this page is written from, probed on the delivered file: 1920x1080, H.264, 30fps, 245.5 seconds, AAC audio. Widescreen, four minutes and five seconds, cornering sequences cut from a long point-of-view ride with a cinematic titled intro and the arrival as the closing sequence.

Four minutes is long for edited video and right for this audience. Riders watch route films end to end, and cutting a ride to sixty seconds removes the thing they came for, which is the sensation of the road going on.

When does this not work well?

A point-of-view ride is one fixed camera bolted to a moving object, which puts a hard limit on what any edit can do with the material afterwards. Vizard Agent finds the sections that matter and cuts them well, and the footage remains exactly what was captured on the day.

How do you fix a result that came back wrong?

Name the section. Vizard Agent keeps the located sequences, the frame samples, the intro tests and the cut-point inspections, so restoring a corner or changing the ending is a re-render against an analysis it already did of the whole ride.

How does Vizard Agent compare to doing it yourself?

By hand this means scrubbing a two-hour ride looking for the good bends, which is genuinely tedious because every minute looks like every other minute at a glance. Most riders give up and post the whole thing, which is why so much ride footage never gets watched.

By hand Vizard Agent
Finding the corners Scrub two hours of road The whole ride analysed for the section type
Cut points Trim roughly Frames inspected either side of every cut
The ending The last corner Rebuilt after looking at what else was there
The intro A title over black Background candidates compared, titles tested

Common questions

How long a ride can Vizard Agent handle? The whole recording. It analyses for sections rather than watching it end to end.

Why search for corners rather than highlights? Because a ride has no highlights in the usual sense. Asking for a type of section is what makes the search meaningful.

How long should a ride film be? Three to five minutes. This audience watches long-form and a short cut defeats the purpose.

Will Vizard Agent keep the engine audio? Yes, and it measures the levels. The engine is the soundtrack for this format.

Can Vizard Agent add a cinematic intro? Yes, five to eight seconds, and it compares background candidates and tests the titles first.

Why did the ending change? Because after cutting the corners, Vizard Agent looked at what else the footage contained and found the arrival made a better close. That is a judgement worth asking for rather than assuming the last corner is the end.

Does this work for other point-of-view sports? Yes. Cycling, skiing, driving, sailing — anything filmed as one continuous take from a moving position.

Can Vizard Agent add music? Yes, and for ride footage it usually sits under the engine rather than replacing it.

What about number plates and houses? They are in the footage. Ask for blurring if the route passes anywhere you would rather not identify.

Does Vizard Agent check the finished film? Yes. It had this one watched back twice, once for the original cut and once for the new ending.