Vizard Agent

How to build a montage from archival footage

Last updated 2026-08-16 · 6 min read

Give Vizard Agent a theme and it builds a music-driven montage — footage ordered to say something, cut to the track, no narration. If you have your own archive, upload it and the rights question is already answered. If you ask Vizard Agent to source footage, confirm what you are licensed to use before anything is published.

What is the short version?

Three moves, and the first is a decision rather than a step. A montage with no narration lives entirely on the footage and the cutting, so where the footage comes from is both the creative question and the legal one — and it is much easier to settle before the edit than after.

  1. Go to Vizard Agent and settle what footage the montage is built from.
  2. Name a theme and a mood, and say there is no narration.
  3. Confirm the rights on anything you did not shoot yourself.

The rest of this page is what goes into each of those, and where the approach stops working.

What do you need before you start?

A theme, a mood, and a clear answer about the footage. The theme is doing more work here than in any other format on this list, because without narration there is nothing else telling the viewer what the montage is about — the order of the shots is the entire argument.

What do you type into Vizard Agent?

Vizard Agent ships this as a template, and the two clauses after the dash are the format's definition rather than options. "Music-driven, no narration" is what makes it a montage instead of a mini-documentary, and leaving them off tends to get you narration you did not want.

Prompt

Build a montage about [theme] from real archival & stock footage — music-driven, no narration.

Three variants worth keeping:

When the archive is yours

Build a 90-second montage about forty years of the yard from these scans and old tapes (attached). Music-driven, no narration, roughly chronological so the change is visible.

When the order is the argument

Build a 60-second montage about the coastline before and after the storm. Alternate between the two, same framings where possible. No narration, sparse music.

When it opens an event

Build a 45-second montage about what the last ten years of this conference have looked like, from our own footage. Hopeful, builds, ends on the room full.

What are the steps inside Vizard Agent?

Three, and the third is the one specific to this format. Vizard Agent reads the theme, selects and orders the footage so the sequence makes a point, cuts it against the music and grades it to a consistent look — as one request, so the montage you review is finished rather than assembled.

  1. Open the Vizard Agent chat with the prompt above, uploading your archive if you have one.
  2. Pick the tier that matches the job. For anything published the product recommends Max; the free Flash tier is built for quick, simple edits.
  3. Check the provenance of every shot you did not supply. This is the review that matters here, and it is not one the edit performs for you.

What does the result look like?

A montage with an order that means something, cut to music, graded to sit together, in the aspect ratio you named. Vizard Agent keeps the footage and the built version in the project, so a shorter cut or a different track costs a sentence rather than starting again.

It is not instant, and this category was not separately measured. Comparable promotional work runs a median of 28 minutes end to end, with the middle half between 15 and 47 minutes. Across all projects the median cost by tier is Flash 47, Pro 55, Max 242, Ultra 263 credits.

When does this not work well?

A montage has no narrator to explain itself, which is its strength and the source of most of its failures. Everything below is either about footage you do not control or about a theme too vague to order shots around.

The first two are worth taking seriously before you start. Footage you supplied yourself has none of these problems, which is the strongest argument for using your own archive where one exists.

How do you fix a result that came back wrong?

Reply in the same Vizard Agent conversation instead of starting over. The footage and everything Vizard Agent already built are still in the project, so you never re-upload and you are not billed again for work already done — only for what the change costs.

What you see What to say next
The order says nothing "Order it chronologically so the change is the point"
A shot you cannot license "Drop that shot and replace it from my uploads"
It looks like a stock reel "Use only my footage, none sourced"
Wrong feeling "Slower and sparser — longer holds, quieter track"
The clips clash visually "Grade everything to match the oldest footage"

How does Vizard Agent compare to building it yourself?

By hand this is sourcing before it is editing: search archives, clear licences, download, then order, grade and cut to music. The clearing alone can outlast the edit, and the beat-matching at the end is the fiddly part editors budget a day for.

Vizard Agent Sourcing and cutting by hand
Finding footage Part of the same request Archive searches, one at a time
Clearing rights Yours either way Yours
Ordering to a theme Automatic, steerable The craft, by hand
Cutting to music Automatic Frame by frame
Time to a first cut Tens of minutes Days, mostly on sourcing

Note the row that does not change. Vizard Agent removes the searching and the cutting; it does not remove the responsibility for what you publish, and that is the row to plan around.

Common questions

Where does the footage come from if I do not upload any?

Ask Vizard Agent what it used and where it came from, then verify the licence terms for your specific use before publishing. Uploading your own archive avoids the question entirely, which is the more comfortable position for anything commercial.

Can I mix my own footage with sourced material?

Yes, and it is a common way to work — your material where it exists, sourced footage to fill gaps. Ask Vizard Agent for a matching grade, and keep track of which shots came from where.

Should it really have no narration?

That is what makes it a montage. If you find yourself wanting to explain the shots, the format you actually want is a mini-documentary, where an interview or narration carries the argument.

Can I supply my own music?

Yes, and for anything public you should. Upload the track and ask Vizard Agent to cut to it — you already know what that track is licensed for, which is the hardest thing to establish about any other choice.

How long can old footage be on screen?

Longer than modern footage, usually. Archival material rewards holding, and asking Vizard Agent for longer holds and fewer cuts is often the single change that makes one of these stop feeling like a stock reel.